歡迎訪問(wèn)山東途暢路橋工程有限公司網(wǎng)站!

冷再生機(jī)租賃,水泥撒布車(chē)出租

施工租賃熱線

18264104888

您現(xiàn)在所在的位置 :首頁(yè) - 新聞中心 > 行業(yè)資訊
行業(yè)資訊

路面冷再生機(jī)施工如何保證品質(zhì)?
來(lái)源:http://www.stkehao.cn/ 日期:2021-07-23
1、工程項(xiàng)目工序調(diào)節(jié)
1. Project process adjustment
施工團(tuán)隊(duì)動(dòng)工前仔細(xì)規(guī)劃施工設(shè)計(jì),經(jīng)工程師審核后,嚴(yán)格要求按工程施工。在工程施工全過(guò)程中,需要檢驗(yàn)設(shè)計(jì)及?方案貫徹狀況,以確保工程施工一切正常開(kāi)展。
The construction team carefully planned the construction design before the construction, and strictly required the construction according to the project after the engineer's review. In the whole process of project construction, it is necessary to inspect the design and? The implementation of the scheme to ensure the normal implementation of the project construction.
2、再生劑噴撒
2. Regenerant spraying
再生劑必需要計(jì)量精確,噴撒均勻分布。再生劑的噴撒要與復(fù)拌機(jī)的行駛快慢相合適,確保舊地面每平米的噴撒量精確。作業(yè)時(shí),適度檢驗(yàn)再生劑噴撒口是否阻塞,噴撒是不是暢順。隨時(shí)隨地監(jiān)控再生顆粒品質(zhì),依據(jù)路面地面原材料的變動(dòng),及時(shí)性調(diào)節(jié)再生劑,確保再生顆粒油石比在調(diào)節(jié)的范圍。
The regenerant must be accurately measured and evenly distributed. The spraying of regenerant shall be appropriate to the driving speed of the mixer to ensure the accurate spraying amount per square meter of the old ground. During safe operation, properly check whether the spraying port of regenerant is blocked and whether the spraying is smooth. Monitor the quality of recycled particles anytime and anywhere, adjust the recycled agent timely according to the change of raw materials on the road surface, and ensure that the asphalt aggregate ratio of recycled particles is within the range of adjustment.
冷再生機(jī)出租
3、銑刨深度
3. Milling depth
銑刨薄厚要精確均勻分布,配置專(zhuān)人負(fù)責(zé)檢驗(yàn)銑刨深度,隨時(shí)隨地檢驗(yàn),察覺(jué)銑刨深度偏差過(guò)大及時(shí)性調(diào)整,銑刨深度偏差為5mm,盡可能確保精確。不損壞原相結(jié)合面為宜;要是原地面上邊層和下邊層結(jié)合不佳,有疏松問(wèn)題,必需將松散層全部銑刨干凈,并且這時(shí)工程施工快慢適度減慢,以確保相結(jié)合位置有充足的溫度,確保再生地面和原地面面層相結(jié)合優(yōu)良。
The milling thickness shall be accurately and evenly distributed, and a special person shall be assigned to inspect the milling depth, inspect it anytime and anywhere, detect that the milling depth deviation is too large, and adjust it in time. The milling depth deviation is 5mm to ensure accuracy as much as possible. It is better not to damage the original joint surface; If the combination of the upper and lower side layers of the original ground is poor and there is a problem of looseness, all the loose layers must be milled and cleaned, and the construction speed of the project shall be moderately slowed down at this time, so as to ensure that there is sufficient temperature at the combination position and ensure the excellent combination of the recycled ground and the original surface layer.
4、再生顆粒實(shí)驗(yàn)
4. Regeneration particle experiment
嚴(yán)格要求按前述調(diào)節(jié)標(biāo)準(zhǔn)的項(xiàng)目及頻率抽樣實(shí)驗(yàn),標(biāo)準(zhǔn)操作。每日及時(shí)性抽樣實(shí)驗(yàn),并及時(shí)性報(bào)告抽提實(shí)驗(yàn)結(jié)論,具體指導(dǎo)工程施工。
It is strictly required to conduct sampling test and standard operation according to the items and frequency of the above adjustment standards. Timely sampling test shall be conducted every day, and timely report shall be made to extract the test conclusions to guide the project construction.
  • 上一條:冷再生技術(shù)存在的問(wèn)題和發(fā)展方向!
  • 下一條:冷再生機(jī)公路施工優(yōu)勢(shì)特點(diǎn)
  • 相關(guān)產(chǎn)品:

    相關(guān)新聞: