冷再生技術質量檢查程序是什么?
來源:http://www.stkehao.cn/ 日期:2021-04-12
  冷再生技術質量檢查程序的質量體系要結合工程施工的進行順序、進展情況及時、有效地開展工作。
  The quality system of cold recycling technology quality inspection procedure should be carried out timely and effectively in combination with the construction sequence and progress.
  一、在開工前負責進行:
  1、 Be responsible for the following before the commencement of Construction:
  1)原材料的驗證試驗、配合比設計等標準試驗及定線等測量工作;2)特殊材料或工藝的試驗、研究、論證及報批;3)施工準備情況的自檢;4)開工報告完成及報批。
  1) Standard tests such as raw material verification test, mix proportion design and other standard tests and alignment survey work; 2) test, research, demonstration and approval of special materials or processes; 3) self inspection of construction preparation; 4) completion and approval of commencement report.
  二、在施工過程中負責進行:
  2、 During the construction process, it is responsible for:
  1.進行工序及工藝過程的試驗檢測控制。糾正不良操作方法,改進和提高落后的工藝水平,控制工程的質量標準。
  1. Test and control the process and process. Correct the bad operation method, improve and improve the backward technology level, and control the quality standard of the project.
  2.記錄整理施工原始記錄。
  2. Record and sort out the original construction records.
                冷再生機租賃
  3.對完工的分項工程或部位進行自檢評定,形成自檢記錄,對自檢合格的工程提交轉序申請報告。
  3. Carry out self inspection and evaluation for completed sub projects or parts, form self inspection records, and submit application report for sequence transfer of qualified projects.
  4.對工程施工過程中出現的各種影響施工和工程質量的情況、問題,及時進行協調、改正和處理。
  4. Timely coordinate, correct and deal with various situations and problems that affect the construction and project quality during the construction process.
  5.對工程中出現的質量事故負責按規定的程序和要求進行報告處理。
  5. Report and handle the quality accidents in the project according to the specified procedures and requirements.
  6.負責落實有關方面關于工程施工及質量的要求或指令。
  6. Be responsible for implementing the requirements or instructions of relevant parties on project construction and quality.
  三、工程竣工后負責進行:
  3、 After the completion of the project, be responsible for:
  1.對工程進行自檢評定工作。
  1. Carry out self inspection and evaluation for the project.
  2.整理竣工資料。
  2. Sort out the completion data.
  3.完成竣工報告。
  3. Complete the completion report.
  4.負責工程質量責任期內的質量問題處理。
  4. Be responsible for the treatment of quality problems within the project quality responsibility period.
  5.和有關部門對工程進行交(竣)工工程質量鑒定和工程驗收工作。
  5. Carry out quality appraisal and acceptance of the project with relevant departments.