冷再生機作業時的一些情況你知道嗎?
來源:http://www.stkehao.cn/ 日期:2020-11-18
冷再生機一次破碎拌合寬度為2.4米,工作時經常會有一輛水罐車緊跟作業保證拌合用水,拌合過程中按照試驗單所規定的高于平時含水量,除此之外還需要有一輛水罐車需滿水隨時處于待命狀態,一旦跟再生機作業的水罐沒水了,需即刻補上。
The width of one-time crushing and mixing of cold regenerator is 2.4 meters. When working, there is often a water tank car closely following the operation to ensure the mixing water. During the mixing process, according to the water content specified in the test sheet, it is necessary to have a water tank truck full of water and be on standby at any time. Once the water tank following the regenerator runs out of water, it needs to be replenished immediately.
冷再生機出租的時候需要進行對再生混合料拌,應立即用平地機初步整形。在直線和不設超高的平曲線段,平地機由路肩向路中心進行刮平。很多冷再生機出租的時候,都會面對這點,對路面的整形過程中應及時粗細料離析現象。既由人工配合機械把大塊沒有破碎掉的舊路料掉。冷再生機租賃時候一般行走比較困難,則需先由冷再生機對舊路面層進行銑刨后,在破碎料上再鋪水泥,進行冷再生拌合施工。
When the cold recycling machine is rented, the recycled mixture needs to be mixed, and the grader should be used for preliminary shaping immediately. In straight lines and flat curved sections without superelevation, the grader scrapes from the shoulder to the center of the road. Many cold recycling machine rental, will face this point, the road surface shaping process should be timely eliminate the segregation of coarse and fine materials. On the other hand, the old road material which has not been broken is removed by manual and mechanical means. Generally, it is difficult to walk when the cold recycling machine is rented, so it is necessary to mill the old pavement layer by the cold recycling machine, and then pave cement on the crushed materials for cold recycling mixing construction.
以上是關于冷再生機路面作業的一些常見情況,如您想要了解更多資訊內容請點擊網站,冷再生機租賃http://www.stkehao.cn。