公司新聞
冷再生質(zhì)量控制應(yīng)該怎么做?
來源:http://www.stkehao.cn/ 日期:2020-09-10
工程在施工中,都需要質(zhì)量的控制,這樣才能保證后續(xù)的效果。那么,冷再生質(zhì)量控制該怎么辦?
In the construction of the project, all need quality control, so as to ensure the follow-up effect. So, how to control the quality of cold regeneration?
想要保證冷再生的質(zhì)量控制,要按照以下三點來做:
To ensure the quality control of cold regeneration, the following three points should be followed:
1.施工前要進行原材料的各項試驗,檢驗合格后方可使用。施工前要進行混合料的各項試驗,當(dāng)確認材料未發(fā)生變化時,方可施工。
1. Various tests of raw materials shall be carried out before construction, and they can be used only after passing the inspection. Before the construction, various tests of mixture shall be carried out, and the construction can be carried out only when it is confirmed that the materials have not changed.
2.施工中應(yīng)隨時檢測混合料中結(jié)合料與添加劑等的含量,保證施工質(zhì)量。
2. During the construction, the content of binder and additives in the mixture should be detected at any time to ensure the construction quality.
3.施工中應(yīng)根據(jù)混合料的拌和和易性等情況及時調(diào)整用水量。
3. During the construction, the water consumption should be adjusted in time according to the mixing and workability of the mixture.
以上是關(guān)于冷再生質(zhì)量控制做法的相關(guān)內(nèi)容介紹,希望對大家有所幫助,如您想要了解更多內(nèi)容歡迎關(guān)注我們的網(wǎng)站。
The above is about the cold recycling quality control practices related content introduction, I hope to help you, if you want to know more content, please pay attention to our website.