因設計要求不同,各施工撒布物料也不盡相同。目前,施工物料多為水泥、白灰,但也有物料為土凝巖、粉煤灰等。
Due to different design requirements, the construction materials are not the same. At present, the construction materials are mostly cement and lime, but there are also some materials such as concrete rock and fly ash.
目前,市面上的水泥多穩定,但也存在摻雜粉煤灰量過大而造成撒布揚塵和打料揚塵大的現象。
At present, the cement on the market is mostly stable, but there is also a phenomenon that the amount of doped fly ash is too large, resulting in large dust from spreading and striking.
白灰一般要求為球磨白灰,但受多方面制約,目前市面上的白灰多摻雜石粉、石硝等,造成白灰干濕度、顆粒度等不好掌控,給白灰施工造成了非常大的影響。針對于不同的物料,在施工過程中大家要注意以下幾點:
Generally, the white ash is required to be ball milled white ash, but it is restricted by many aspects. At present, the white ash on the market is mostly mixed with stone powder and stone nitrate, which makes it difficult to control the dry humidity and particle size of the white ash, and has a great impact on the white ash construction. For different materials, we should pay attention to the following points during construction:
(1)物料不要長時間在車廂內存放,及時排放干凈。
(1) Materials shall not be stored in the carriage for a long time and shall be discharged in time.
(2)不要顛簸運輸。
(2) Do not transport bumpily.
(3)根據物料適當調整車廂內部人字架縫隙及均整器角度,均整器振動器常開。
(3) Adjust the A-frame gap and equalizer angle inside the carriage properly according to the materials, and the equalizer vibrator is normally open.
(4)如白灰濕度大在車廂內搭橋,可根據實際搭橋位置調整物料減重錐副板縫隙,調整后隨時注意液壓壓力變化情況。
(4) If the lime is wet enough to bridge in the carriage, the gap of the material weight reduction cone sub plate can be adjusted according to the actual bridging position. After adjustment, pay attention to the change of hydraulic pressure at any time.
(5)如白灰含一定顆粒或粘度、濕度偏大,絞龍、計量器啟動液壓壓力偏高,可選擇絞龍、計量器間隔性啟動,以保證傳輸動力及疏通絞龍、計量器。(壓力過高會增加機械磨損程度,建議調整物料配比)
(5) If the white ash contains certain particles or the viscosity and humidity are too high, and the hydraulic pressure for starting the auger and the gauge is too high, the auger and the gauge can be started at intervals to ensure the transmission of power and dredge the auger and the gauge. (too high pressure will increase the degree of mechanical wear, so it is recommended to adjust the material ratio)
(6)適當調整絞龍、計量器標定參數,絞龍標定適當上調,計量器標定適當下調,車速適當提高(如有不明白之處,請及時致電全國服務熱線:400-000-8839,我們會安排專業的技術人員給您技術指導)。
(6) Properly adjust the calibration parameters of the auger and the gauge, appropriately increase the calibration of the auger, appropriately reduce the calibration of the gauge, and appropriately increase the vehicle speed (if you do not understand, please call the national service hotline at 400-000-8839 in time, and we will arrange professional technicians to give you technical guidance).
(7)陷車路面隨時注意后方物料撒布情況,路面的不平整、下陷隨時有可能會影響撒布效果。
(7) Pay attention to the distribution of materials behind the sunken road at any time. The uneven and sunken road may affect the distribution effect at any time.
(8)白灰如在布料器、計量器軟連接內產生堆積,應及時清理。
(8) If the lime accumulates in the soft connection of the distributor and the meter, it shall be cleaned in time.
本文的精彩內容由水泥撒布車租賃提供知識提供,本網站還有很多的精彩內容,更多的內容您可以點擊進入http://www.stkehao.cn我們有專門的客服為您解答問題
The wonderful contents of this article are provided by the knowledge provided by the cement spreader rental. There are many wonderful contents on this website. You can click to enter more contents http://www.stkehao.cn We have special customer service to answer your questions